Cyntergy AEC
  • Cyntergy AEC

New Hazardous Materials Managment Center

Norman, OK

Completion Date:

-2012

Construction Cost:

-$1.6 Million

Provided:

  • -Architecture
  • -Architecture
  • -Engineering

Cyntergy AEC provided programming and preliminary design of OU's new Hazardous Waste Management Center (HMMC). The new facility adequately prevents any materials from being released into the environment and was designed in accordance with current regulatory requirements set forth by EPA, OSHA, and NFPA for proper and secure storage of hazardous waste and materials. Secured facility access, parking and drives were also included in the program and preliminary design study.